How to reach us

Thuringian State Development Corporation (LEG Thüringen)

Mainzerhofstrasse 12| 99084 Erfurt
Telephone: 0361 5603-0
Write an email

Contact request for tenants

New milestone for green hydrogen in Arnstadt

High-temperature electrolysis stack technology

The pilot plant for the high-temperature electrolysis stack technology (SOEC) developed by Fraunhofer IKTS was opened at the "Erfurter Kreuz" interchange in Arnstadt. Image: Fraunhofer IKTS

On May 27, 2025, Fraunhofer IKTS and thyssenkrupp nucera opened the first pilot production plant for SOEC (Solid Oxide Electrolysis Cell) stacks in Arnstadt. This innovative high-temperature electrolysis technology enables the particularly efficient production of green hydrogen – a key component for the decarbonization of energy-intensive industries. The plant, with a planned annual capacity of 8 MW, marks the transition from research to industrial application. It was inaugurated in the presence of high-ranking representatives from politics, science, and industry, including Thuringia's Minister-President Mario Voigt. The strategic partnership between Fraunhofer IKTS and thyssenkrupp nucera strengthens the hydrogen technology portfolio and underscores Thuringia's importance as a location for future technologies.

Share this article:

[linguise]